Craig drives for a company specialising in abnormal loads. He has a 3 axle tractor unit pulling a 4-axle extending semi-trailer working under STGO Category 2 rules. His tractor unit has a kerbside weight of 9 tonnes and the extending semi-trailer weighs 17 tonnes.
Today Craig is taking a 50 tonne track-laying excavator to Aberdeen from Newcastle.
Today Craig is taking a 50 tonne track-laying excavator to Aberdeen from Newcastle.
There are 6 multiple choice questions in this case study. Read this carefully and ensure you fully understand the scenario before starting the test. You need to score 5 out of 6 to pass.
Test Quick View
Click on an answer to view the correct choice along with the explanation.
B
C
D
Correct Answer: B
Explanation: • 1 day: No, it would be longer than this.
• 3 days: No, it does not require this much notice.
• 5 days: No. it does not require this much notice.
• 2 days: Yes.
Explanation: • 1 day: No, it would be longer than this.
• 3 days: No, it does not require this much notice.
• 5 days: No. it does not require this much notice.
• 2 days: Yes.
Correct Answer: B
Explanation: • Category C: No, Category C would only permit the driving of rigid goods vehicles.
• Category C+E plus 102 restriction: No, this would only permit the driving of a rigid vehicle towing a trailer.
• Category D+E: No, this permits the driving of a large passenger vehicle with a trailer exceeding 750 kg.
• Category C+E: Yes.
Explanation: • Category C: No, Category C would only permit the driving of rigid goods vehicles.
• Category C+E plus 102 restriction: No, this would only permit the driving of a rigid vehicle towing a trailer.
• Category D+E: No, this permits the driving of a large passenger vehicle with a trailer exceeding 750 kg.
• Category C+E: Yes.
3. What is the maximum permissible train weight for a vehicle or vehicle combination operating under STGO Category 2?
Mark one answer
B
C
D
Correct Answer: D
Explanation: • 46 tonnes: No this would be the appropriate limit for a 5 axle vehicle combination working under STGO Category 1.
• 50 tonnes: No this would be the appropriate limit for a 6 axle vehicle combination working under STGO Category 1.
• 150 tonnes: No this would be the appropriate limit for a vehicle combination working under STGO Category 3.
• 80 tonnes: Correct.
Explanation: • 46 tonnes: No this would be the appropriate limit for a 5 axle vehicle combination working under STGO Category 1.
• 50 tonnes: No this would be the appropriate limit for a 6 axle vehicle combination working under STGO Category 1.
• 150 tonnes: No this would be the appropriate limit for a vehicle combination working under STGO Category 3.
• 80 tonnes: Correct.
B
C
D
Correct Answer: C
Explanation: • 12 metres: No this would be the maximum length of a rigid vehicle.
• 13.6 metres: No this would be the maximum length of a semi-trailer.
• 18.75 metres: No this would be maximum length of a road-train.
• 16.5 metres: Correct.
Explanation: • 12 metres: No this would be the maximum length of a rigid vehicle.
• 13.6 metres: No this would be the maximum length of a semi-trailer.
• 18.75 metres: No this would be maximum length of a road-train.
• 16.5 metres: Correct.
5. What is the maximum speed on a motorway for a vehicle or vehicle combination operating under STGO Category 2?
Mark one answer
B
C
D
Correct Answer: A
Explanation: • 60 mph: No. this would be the appropriate speed limit for a standard HGV on a motorway (albeit it would be limited to 56 mph by its speed limiter).
• 56 mph: No. this would be the maximum speed at which the speed limiter can be set.
• 50 mph: No. this would be the maximum speed for an articulated vehicle on a dual carriageway.
• 40 mph: Yes.
Explanation: • 60 mph: No. this would be the appropriate speed limit for a standard HGV on a motorway (albeit it would be limited to 56 mph by its speed limiter).
• 56 mph: No. this would be the maximum speed at which the speed limiter can be set.
• 50 mph: No. this would be the maximum speed for an articulated vehicle on a dual carriageway.
• 40 mph: Yes.
Correct Answer: C
Explanation: • 250 mm: No, this would not require side markers.
• 300 mm: No, this would not require side markers.
• 400 mm: No, the requirement for side markers comes in before this.
• 305 mm: Yes.
Explanation: • 250 mm: No, this would not require side markers.
• 300 mm: No, this would not require side markers.
• 400 mm: No, the requirement for side markers comes in before this.
• 305 mm: Yes.